Repacking of the system (after system activated) is not possible by the user because special factory tooling is needed for pressing the parachutes. Factory repacking after system activated cost is without shipping, the user must send just the used parachute. Repack includes new set of 3 pyroactuators, new piston, new container cover, repacking and pressing of parachutes to inner container.
When shipping new unit, pyroactuators are shipped outside the parachute container in special certified transport capsule (shipment is then declassified from ADR).